HAL Delivery & Versioning Standard Operating Procedure

See also: Definition of Done — checklists for each gate transition (RED→AMBER, AMBER→GREEN, Baseline 1.0 freeze, post-baseline changes).

1. Goal: AIDL Baseline 1.0

This repository contains all RDK HAL interface definitions written in AIDL. The objective is to drive every interface through a structured review process until every component is frozen at AIDL Baseline — the production-ready release that SoC vendors and OEMs implement against. Components are frozen individually as they become ready; the full baseline is reached when all components have been frozen.

The lifecycle has two distinct phases:

Phase Versions What is happening
Pre-Baseline (current) 0.<gen>.<minor>.<patch> Interfaces are being defined, reviewed, and iterated. Breaking changes are expected — that is the point of this phase. Each component moves RED → AMBER → GREEN through 14+5 review cycles.
Post-Baseline AIDL version 1, 2, 3... Interfaces are frozen. All changes are 100% backwards compatible (AIDL stable versioning). A breaking change requires creating an entirely new module.

We are currently in the Pre-Baseline phase. Getting the interfaces right now is critical — once a component is frozen and moves to AIDL versioning, its contract is permanent.


2. Component Structure

Every HAL is managed as a self-contained component. All code, documentation, and metadata reside within a versioned subdirectory:

<component>/
  metadata.yaml            # Single Source of Truth (component-level)
  current/
    <ComponentName>.aidl   # Interface definition(s)
    docs/                  # Component-level documentation

For VSI (Virtual System Interface) components, the structure nests under vsi/:

vsi/<component>/metadata.yaml

The metadata.yaml file sits at the component root (not inside current/) because it describes component-level state — RAG status, reviewer sign-off, lifecycle dates — rather than a specific version snapshot. It is the Single Source of Truth for every component.


3. Versioning Scheme

Important: The component version in metadata.yaml tracks the interface contract for that individual component. It is independent of the git repository version, which tracks changes across all 33 components via commits and tags. A single git commit may update one component's version without affecting any other.

Pre-Baseline: 0.<generation>.<minor>.<patch>

During pre-baseline, version numbers use a 4-part scheme. Breaking changes are expected and normal during this phase — the purpose is to iterate until the interface is right.

Field Meaning Bumped when
0 Pre-baseline prefix (always 0 until AIDL freeze) Never — changes to 1 at freeze
generation Architectural era Breaking change to the interface
minor ABI-compatible enhancement counter Non-breaking feature or method added
patch Documentation or trivial fix counter No interface change

Examples:

  • 0.0.0.1 — Initial definition (generation 0), first revision
  • 0.1.0.0 — Entered generation 1 (first full design cycle complete)
  • 0.1.1.0 — ABI-compatible enhancement added to generation 1
  • 0.1.1.1 — Documentation fix (no interface change)
  • 0.2.0.0 — Breaking change since generation 1 → new generation

Rules:

  • A breaking change (method signature change, removed method, changed semantics) bumps the generation and resets minor + patch to 0.0
  • A non-breaking addition (new method, new enum value) bumps minor and resets patch to 0
  • A documentation-only change bumps patch

Post-Baseline: AIDL Stable Versioning

Once a component reaches AIDL Baseline and is frozen, it follows AIDL stable interface versioning. This is a fundamentally different model:

Rule Detail
Version = single integer 1, 2, 3, 4...
100% backwards compatible Every version must be fully backwards compatible with all previous versions. Existing methods, signatures, and semantics cannot change.
Additive only New methods and types can be added. Nothing can be removed or modified.
Breaking change = new module If a breaking change is unavoidable, a new module is created (e.g. hdmi_inputhdmi_input_v2). The original module continues to exist.

This is why getting interfaces right pre-baseline is critical. Once frozen, the interface contract is permanent. A mistake after freeze means carrying a new module indefinitely.


4. RAG Status & What It Means

Each component carries a RAG status in its metadata.yaml:

Status Meaning Who acts
🔴 RED Not ready for review. Requirements gathering, strategy decisions, or foundational drafting still in progress. Architecture team defines scope and direction.
🟡 AMBER Under active ingestion. The interface is being defined and iterated. It will enter a 14+5 sprint review cycle as soon as it is ready. Architecture drives design iteration; reviewers prepare for the sprint window.
🟢 GREEN ("Implementable") Reviewed and approved. The interface is stable on develop. SoC vendors and OEMs can begin or continue implementation. SoC/OEM teams consume the interface. Changes require a new review cycle.

The Journey to GREEN

RED  ──────────>  AMBER  ──────────>  GREEN
                    │                    │
 Requirements       │   14+5 Review     │   Stable on develop.
 & strategy         │   Cycle(s)        │   SoC implementation
 decisions          │                    │   can proceed.
                    │                    │
                    └── may cycle ──────>┘
                        multiple times

A component may go through multiple AMBER review cycles before reaching GREEN. Feedback from one cycle may require design iteration and a subsequent cycle.


5. The "14+5" Accelerated Delivery Cycle

All HAL interface changes move through a strictly time-boxed review lifecycle.

Phase A: 14-Day Open Review Window

  • A Pull Request is published and assigned to the mandatory reviewers plus the relevant domain team.
  • All technical feedback must be submitted within 14 calendar days.
  • Silence equals consent. If no feedback is provided within the window, the component progresses to Phase B as "accepted."

Phase B: 5-Business-Day Resolution Sprint

Immediately following the 14-day review:

Day Activity
Days 1–3 Implementation. The HAL Lead triages feedback and implements required changes.
Day 4 Sanity check. Updated interface is re-shared for a final 24-hour verification. No new feature requests permitted.
Day 5 The Merge. metadata.yaml is updated to GREEN, code is merged to develop.

Lifecycle Tracking in Metadata

The lifecycle section in metadata.yaml records the active cycle dates:

lifecycle:
  review_started: 2026-03-10      # Day the PR was opened for review
  review_deadline: 2026-03-24     # review_started + 14 calendar days
  target_green_date: 2026-03-31   # review_deadline + 5 business days

When no cycle is active, all dates are set to ~ (null). The scripts/pr_cycle.sh tool manages these dates:

# Start a review cycle (defaults to today)
./scripts/pr_cycle.sh <component> --start [YYYY-MM-DD]

# End a cycle (clear dates for one component)
./scripts/pr_cycle.sh <component> --stop

# Mass reset all lifecycle dates
./scripts/pr_cycle.sh --clear

Only lifecycle dates are changed — RAG status and reviewer states are managed separately through the PR and merge process.


6. Pre-Baseline: The Path to AIDL Baseline 1.0

Current State

The repository contains 33 components across two responsibility types:

Type Responsibility
SOC SoC vendor implements the interface
OEM OEM/platform team implements the interface

SOC Components (15)

Component Description
audiodecoder Audio decoder resource management and codec format support
audiomixer Audio mixing and routing for multi-stream output
audiosink Audio output rendering and sink device management
avbuffer AV buffer allocation and secure video path management
avclock Audio/video clock synchronization and timing control
hdmicec HDMI CEC protocol messaging and device control
hdmiinput HDMI input port management and signal detection
hdmioutput HDMI output port configuration and display control
planecontrol Graphics and video plane composition control
videodecoder Video decoder resource management and codec support
videosink Video output rendering and display sink management
vsi/crypto HAL lower-layer cryptography and security API requirements
vsi/graphics Graphics subsystem and display pipeline interface
vsi/kernel Kernel interface strategy and system abstraction
vsi/keyvault HAL lower-layer key vault and encrypted storage requirements

OEM Components (18)

Component Description
boot Boot reason tracking and reboot management
broadcast Broadcast tuner and RF frontend interface
cdm Content decryption module and DRM key management
common Common types, enumerations, and shared interface definitions
compositeinput Composite video input capture and control
deepsleep Deep sleep and low-power state management
deviceinfo Device information and platform capability reporting
ffv Far-field voice capture and mic array processing
flash Firmware image storage and update management
indicator LED and visual indicator state management
panel Front panel display and button control
r4ce RF4CE remote control protocol and pairing
sensor Hardware sensor data acquisition and monitoring
vsi/abstractfilesystem Abstract file system interface and storage abstraction
vsi/bluetooth Bluetooth stack integration and profile support
vsi/filesystem File system layout standards and partition management
vsi/linuxinput Linux input subsystem and event handling
vsi/wifi Wi-Fi driver integration and network management

Each component is independently tracked through the RED → AMBER → GREEN pipeline. The automated RAG Status Report provides a live view of overall progress.

What "GREEN at 0.x" Means

GREEN is the status referred to externally as "Implementable" — the interface is ready for SoC/OEM implementation.

A GREEN component at version 0.x.y.z means:

  1. The interface has been reviewed and approved by all assigned stakeholder teams
  2. It is stable on the develop branch
  3. SoC vendors and OEMs can begin implementation
  4. The interface definition is not yet frozen — it may still evolve through further review cycles if required, but the current design is considered production-viable

GREEN at 0.x is not the same as frozen. Breaking changes are still possible (bumping the generation number). This flexibility is deliberate — we need to get the interfaces right before the permanent freeze.

Freezing a Component at AIDL Baseline

The freeze happens per-component, not as a monolithic repo-wide event. A component that is ready should not be held back because others are still iterating. This means the repository will contain a mix of pre-baseline (0.x.y.z) and frozen (AIDL integer) components at the same time.

A component is ready to freeze when:

  1. Status is GREEN — the interface has been reviewed and approved
  2. Generation > 0 — the interface has been through at least one full design cycle (not still at initial definition)
  3. No unresolved breaking change flags — the current design is considered final
  4. VTS alignment confirmed — the VTS Team has validated test strategy
  5. RTAB sign-off — the RTAB Group has reviewed for system-level alignment
  6. Architecture sign-off — Architecture confirms the interface is ready for permanent commitment

On freeze:

  • The component's AIDL version is set to 1 (AIDL stable versioning)
  • The pre-baseline 0.x.y.z version in metadata.yaml is replaced by the AIDL version integer
  • Post-Baseline rules take effect for that component — all future changes must be 100% backwards compatible, or a new module must be created (see Section 7)

Full AIDL Baseline is reached when every component in the repository has been individually frozen. This is the milestone, not a gate.


7. Post-Baseline: Maintaining AIDL After Freeze

Once a component is frozen at AIDL Baseline, it follows AIDL stable interface versioning. The rules are strict and non-negotiable.

Permitted Changes (Additive Only)

All changes after freeze must be 100% backwards compatible:

  • Add new methods to an existing interface
  • Add new types, enums, or parcelables
  • Add new interfaces within the same module
  • Documentation updates

These go through a standard 14+5 review cycle. The AIDL version integer is incremented (e.g. version 12). The component remains GREEN.

Breaking Changes: New Module Required

If a change cannot be made backwards-compatibly, the original interface cannot be modified. Instead:

  1. A new module is created alongside the original (e.g. hdmi_inputhdmi_input_v2)
  2. The original module continues to exist and must remain supported
  3. The new module goes through the full RED → AMBER → GREEN lifecycle as a new component
  4. SoC vendors and OEMs are notified and must support both versions during the transition period

This is by design — it forces careful interface design pre-baseline and ensures that deployed implementations are never broken by upstream changes.

Breaking Changes

Breaking changes are signalled via the breaking-change label on the PR or issue at creation time. This is visible to reviewers immediately and drives review prioritisation. When the change is merged and the component is released, the version is bumped accordingly (generation bump for pre-baseline, new module for post-baseline).


8. Stakeholder Management & Roles

Mandatory Reviewers (all components)

Team Responsibility
Architecture Final decision authority on feedback. Drives the 5-day resolution window.
RTAB_Group System-level alignment and stakeholder visibility above the engineering level.
Product_Architecture Cross-component alignment and product-level sign-off.
VTS_Team Validation and test strategy review for all components.

Domain Reviewers (assigned per component)

Team Domain
AV_Architecture Audio/Video pipeline components
Broadcast_Team Broadcast and tuner components
Control_Manager_Architecture Remote control and input management
Graphics_Architecture Graphics, display, and composition
Connectivity_Architecture Bluetooth, Wi-Fi, and connectivity
Kernel_Architecture System, kernel, boot, and platform

Reviewer Status Values

Each reviewer team's sign-off is tracked in metadata.yaml:

Value Icon Meaning
pending Review not yet started
in_review 🔍 Actively reviewing during the 14-day window
changes_requested 🔁 Feedback given, awaiting resolution in the 5-day sprint
recheck 🔄 Previously reviewed, needs re-verification
reviewed Signed off and approved
abstained Not applicable (interface outside this team's domain)

External Stakeholders

  • SoC Vendors: Must provide feasibility feedback during the 14-day review window. They consume GREEN baselines as production-ready interfaces.
  • Middleware (MW): The HAL is the control plane. MW must adapt to the HAL definition once it reaches AMBER/GREEN status.

9. Tooling & Automation

metadata.yaml — Single Source of Truth

Every component directory contains a metadata.yaml that captures:

  • Component identity — name, version, generation, type (SOC/OEM)
  • RAG status — RED, AMBER, or GREEN
  • Lifecycle dates — review start, deadline, and target GREEN date
  • Scope — high-level architectural responsibilities
  • Notes — priority, status detail, required actions, risk, owners
  • Reviewers — per-team sign-off status
  • Impact — breaking change and multi-view sync flags

RAG Status Report

The RAG Status Report is auto-generated from all metadata.yaml files:

./scripts/generate_rag_report.sh

It provides:

  • Overall progress summary (GREEN/AMBER/RED counts)
  • Per-team review status columns for GREEN components
  • Lifecycle deadline tracking for AMBER components
  • Priority-ordered action items for AMBER and RED components

PR Cycle Manager

./scripts/pr_cycle.sh

Manages 14+5 lifecycle dates. See Section 5 for usage.

GitHub Labels

./scripts/setup_labels.sh [--dry-run]

Creates labels on GitHub and cleans up any legacy labels from earlier versions. Idempotent — safe to re-run.

Label Purpose
component:<name> Maps PRs to a specific HAL/VSI component (auto-detected from metadata.yaml)
breaking-change Breaking interface change — bumps generation
documentation-change Documentation-only change — no interface change, bumps patch
scope:infrastructure Repo tooling, CI/CD, governance
scope:overview Tracking ticket spanning multiple components

The label determines the version bump category at release time:

Label Version bump Example
breaking-change Bump generation, reset minor + patch 0.1.2.10.2.0.0
(no label) Bump minor, reset patch 0.1.0.00.1.1.0
documentation-change Bump patch 0.1.1.00.1.1.1

Release-time execution (manual):

# Preview component version bumps since the previous release tag
./scripts/release.sh

# Apply updates to component metadata.yaml files
./scripts/release.sh --apply

All other state (RAG status, reviewer sign-off, lifecycle dates) is tracked in metadata.yaml — the Single Source of Truth. PRs are assigned directly to GitHub teams for review.